
Cabinets INZ
A pre-integrated, pre-wired and pre-verified physical infrastructure platform for industrial networks, built to international standards. Ready to install in 2 days. Certified to operate. With native IIoT intelligence included.
Pre-integrated. Pre-wired. Pre-verified.
The INZ Cabinet turns what is usually a 3-week engineering project —design, procurement, assembly, testing— into a catalog product installed in 2 days. Every unit leaves the factory with managed power, built-in backup, certified structured cabling and native IIoT monitoring connected to Factory View.
Physical protection
Rugged enclosure for harsh environments. IP66 · IK10 · −10° to 50°C.
Smart power
AC/DC with buffer or built-in UPS. Up to 6h of backup during outages.
Connectivity
Shielded Cat 6A patch panel, Cat6A or fiber optic uplink. Agnostic to the industrial switch.
IIoT intelligence
Native sensors reporting to the Factory View platform.
INZ vs. custom-built solution
Traditionally, cabinets are assembled by choosing parts from different suppliers. The result is time, variability and compliance risk. The INZ solves all of that at the factory.



INZ cabinet image gallery
Four layers. One complete system.
The INZ is not a cabinet with a switch inside. It is a four-layer system whose layers work together to ensure connectivity, continuity and visibility in your plant.
Certified industrial enclosure
Rittal-quality carbon steel enclosure with injected perimeter PU seal (stainless steel optional). Resistant to dust, humidity, physical impact and corrosive environments. Automatic interior LED lighting.
IP66 · IK10 · NEMA 1,3R,4,12 · −10° to 50°C · 5-95% RH non-condensing
Power and backup system
Weidmüller AC/DC switching power supply with optional buffer (~11 s, for micro-outages), UPS with DURA ECO battery (~30 min for orderly shutdowns) or redundant supply. Individual 24VDC output breaker for each switch DIN rail.
85–264 VAC · 45-65 Hz · Buffer ~11 s · UPS ~30 min · PowerShield®
High-performance connectivity
Shielded Cat 6A minicom industrial patch panel with copper or fiber optic (LC/SC) uplinks. DIN rail for mounting compatible industrial switches of any brand.
Panduit shielded Cat 6A · Minicom LC/SC fiber · TIA-568 · MICE 1,3,2,2 · 8, 24 or 48 ports
Native IIoT monitoring
Internal NRGY MONITOR node with voltage, current, temperature and humidity sensors and a magnetic door detector. Includes the NRGY MONITOR and SITE MONITOR CP applications with 6 months of Factory View access included.
MQTT · Sparkplug B · Factory View Cloud · Preconfigured dashboard
PowerShield®
The INZ features a patented protective cover that lets technicians work on network equipment without de-energizing the system, eliminating the main cause of accidents in industrial network infrastructure maintenance.
Physical AC/DC + data segregation
A permanent barrier between the electrical compartment and the data area. Network staff have no accidental access to power components.
Uninterrupted operation
Maintenance and re-patching on the patch panel without powering down the switch. No impact on network availability during interventions.
IEC 61439 compliance
Avint takes manufacturer responsibility for the final assembly. It is not a kit of parts — it is a product verified to an international standard.

Your cabinet talks. Factory View listens.
Every INZ with monitoring includes an internal node that publishes the cabinet status to Factory View in real time. Your infrastructure stops being a black box.
6 months of Factory View Cloud included
INZ models with monitoring include 6 months of Factory View Cloud access, with the cabinet already preconfigured in a dashboard.
NRGY MONITOR + SITE MONITOR CP
Electrical monitoring plus cabinet condition monitoring. All in a single pre-installed internal node.
Alerts before your equipment fails
Factory View notifies you immediately if the temperature rises, the door is left open, the UPS kicks in or the power supply reports anomalies.
The INZ as the entry point to the ecosystem
The INZ cabinet is the seed of the Avint ecosystem. It opens the door to SITE Monitor, NRGY Monitor and more solutions.
Find the right model for your application.
| Model | Cabinet | Ports | Power | Uplink | Application |
|---|---|---|---|---|---|
| INZ-4508-PC | 40×50 cm | 8 | Buffer ~11 s | 2×Cat 6A | Single cell, remote station |
| INZ-4508-UC | 40×50 cm | 8 | UPS ~30 min | 2×Cat 6A | Single cell with backupNRGY + SITE MONITOR |
| INZ-4508-UF | 40×50 cm | 8 | UPS ~30 min | Fiber optic 6h | Cell with fiber uplinkNRGY + SITE MONITOR |
| INZ-4516-PC | 40×50 cm | 16 | Buffer ~11 s | 2×Cat 6A | Small process areaNRGY + SITE MONITOR |
| INZ-4516-UC | 40×50 cm | 16 | UPS ~30 min | 2×Cat 6A | Process area with backupNRGY + SITE MONITOR |
| INZ-6824-UC | 60×80 cm | 24 | UPS ~30 min | 2×Cat 6A | Full production lineNRGY + SITE MONITOR |
| INZ-6848-UC | 60×80 cm | 48 | UPS ~30 min | 2×Cat 6A | Consolidated OT area, multiple cellsNRGY + SITE MONITOR |
| INZ-6824-POE | 60×80 cm | 24 PoE++ | 48 VDC PoE | Cat 6A + Fiber 6h | IP cameras, industrial APs, machine vision |
Certified. In every unit.
Avint takes manufacturer responsibility for every INZ cabinet delivered. It is not a kit of parts: it is a final assembly verified to the most demanding standards.
Application sectors
The INZ pays for itself by avoiding a single micro-outage.
The cost of the INZ is not the price of the cabinet. It is the difference between losing hours of production —or not.
Estimated cost per hour of line stoppage in manufacturing
Industry reference. Varies by sector and process.
Reduction in deployment time vs. the traditional method (3 weeks → 2 days)
Factory View Cloud access included with monitoring models
Don't design another cabinet from scratch.
Request a live virtual demonstration of Factory View and a comparative total cost analysis for your next network deployment.
ventas@avint.io · soporte@avint.io · www.avint.io